Rehabilitation works of Dumbadze Street in Kutaisi will be completed soon.Pedestrian paths and drainage network have already been arranged. Asphalt pavingwill be started in the near future. Mayor of Kutaisi Giorgi Tchighvaria inspected theworks together with the head of the Infrastructure Service. According to hisstatement, the rehabilitation process is actively going on, while the water supplycompany is working on the spot to set new water pipes timely, so that the roadsurface can be laid soon.The works on Dumbadze Street are being carried out by the company Dagi+. The project costs 1 ml 70 000 GEL. At the same time, the water supplycompany is working on the spot to set water pipes and lay the road surface timely.We control the terms and quality of the works as much as possible. "Iashvili and Baratashvili streets are also being rehabilitated," said Mayor of Kutaisi Giorgi Tchighvaria.