Rehabilitation works of the road surface on Tabidze Street have been resumed. The mayor Giorgi Chighvaria and the Deputy Mayor Yuza Ugulava, together with city council members, inspected the ongoing works on Tabidze Street. Also in the active phase is the paving of the sidewalks with colored paving. The complete rehabilitation of Tabidze Street started on March 26 of this year. 1 007 306 GEL was allocated from the Regional Development Fund for the works. Geo Service Ltd did not fulfill its obligation due to which the contract was terminated and a new tender was announced.
The tender has already been completed and the winning company is LTD "Palada" . 809 204 GEL was allocated for the works. Rehabilitation of the road surface and pedestrian area on Lortkipanidze Street is also underway. The installation of the natural gas pipe has already been completed, the wires have been placed underground, and a drainage system has been arranged. 245 000 GEL has been allocated for the rehabilitation of the road surface and footpaths. The works are carried out by ltd "Mshenebeli" .