Rehabilitation works of the road at 221 Tabukashvili Street in Vakisubani settlement are underway in Kutaisi. At the mentioned place, the locals have been suffering from road problems for 30 years. Consequently students will no longer have mobility problems. The Mayor of Kutaisi Giorgi Chighvaria inspected the road rehabilitation works together with Mamuka Rizhamadze, a majoritarian MP from Vakisubani. In this case, this road was vital for the locals. The road, sidewalks and drainage system are capitally made. The quality of works and asphalt is also checked. "We are controlling that the works are completed on time and that the population faces fewer problems in the rehabilitation process," said the mayor of Kutaisi.